Bright White Satin 24 x 24 inch Metal Tin Ceiling Tiles
Colors:
Prices updated 3 days ago
Wayfair
Lowest Price
Home Depot
Description
Elevate your space with these stunning 24 x 24 inch metal tin ceiling tiles. Featuring a bright white satin finish and a modern geometric pattern, these tiles add dramatic three-dimensional depth to any ceiling or accent wall. Rust and heat resistant, they offer both durability and style.
Specifications
Other Variants
Related Products
Similar Products
3D Falkirk Retro III 38 in. X 19 in. Pearl White Faux Tile PVC Decorative Wall Paneling (10-Pack)
Home Depot
3D Falkirk Retro III 38 in. X 19 in. White Grey Faux Tile PVC Decorative Wall Paneling
Home Depot
3D Falkirk Retro IV 23 in. X 23 in. Pearl White Faux Brick PVC Decorative Wall Paneling
Home Depot
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Broken Tile 3D Decorative Wall Panel 10-Pack
Home Depot
Peel And Stick Wall Molding Kit,6 Sets Pre-Cut Wainscoting Panels For Interior Wall Moulding Decor,Pre Made Wainscoting Wall Panel For Home Decoration
Amazon.com
Art3d Drop Ceiling Tiles 24X24 Inch (12-Pack, 48 Sq.Ft) - Glue Up PVC Ceiling Tiles 2X2 Ft., Decorative Ceiling Panels For Kitchen, Living Room,
Amazon.com
FASADE Traditional Style/Pattern 4 Decorative Vinyl Backsplash Panel In Gloss White (6X6 Inch Sample)
Amazon.com
PETSTIBLE 10 Pcs 3D Wall Panels Peel And, White Brick Printable 3D Wallpaper And Peel Self Adhesive Waterproof Foam Faux Brick Paneling For Bedroom,
Amazon.com
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Floral 3D Decorative Wall Panel 10-Pack - 323248060
Home Depot
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Shapes 3D Decorative Wall Panel 10-Pack - 323248050
Home Depot
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Square 3D Decorative Wall Panel 10-Pack
Home Depot
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Trapezium 3D Decorative Wall Panel 10-Pack
Home Depot
Falkirk Jura III 1/4 in. X 28 in. X 28 in. Peel & Stick Off-White Faux Brick PE Foam Decorative Wall Paneling (10-Pack)
Home Depot
Art3d 19.7" X 19.7" (Pack Of 12) 3D Wall Panels Lucky Leaves PVC Wall Panel For Inter Decoration, Living Room, TV Background, Office, White
Amazon.com
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Diamonds 3D Decorative Wall Panel 10-Pack
Home Depot
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Bricks 3D Decorative Wall Panel 10-Pack - 323248023
Home Depot
Art3d 33 Pack Decorative PVC Wall Panels 12"X12" For Interior Wall Decor Living Room TV Background Gaming Room Decor With Diamond Design In Matt White
Amazon.com
Falkirk Ross 2/25 in. X 19.7 in. X 19.7 in. White PVC Diamond 3D Decorative Wall Panel - 323247986
Home Depot
Ekena Millwork 19 5/8"W X 19 5/8"H Nestor Endurawall Decorative 3D Wall PANEL, White - 10-Pack
Northofalpine Us
19 5/8"W X 19 5/8"H Classic Endurawall Decorative 3D Wall Panel Covers 32.1 Sq. Ft. (12-Pack For 32.1 Sq. Ft.)
Home Depot