Gloss White Floral Pattern Tin Ceiling Tile Pack
Gloss White Floral Pattern Tin Ceiling Tile Pack
Gloss White Floral Pattern Tin Ceiling Tile Pack
Gloss White Floral Pattern Tin Ceiling Tile Pack
Gloss White Floral Pattern Tin Ceiling Tile Pack
Gloss White Floral Pattern Tin Ceiling Tile Pack
Gloss White Floral Pattern Tin Ceiling Tile Pack
Gloss White Floral Pattern Tin Ceiling Tile Pack

Gloss White Floral Pattern Tin Ceiling Tile Pack

Colors:

White
$1,895.00 $74.99 96% less
Prices are currently low

Prices updated 3 days ago

Home Depot

Lowest Price

$74.99

Wayfair

$94.75

Zoro

$97.75

Description

Add a touch of elegance and class to any space with these gloss white floral pattern tin ceiling tiles. Perfect for ceilings and backsplashes, these tiles offer versatility and fire resistance, making them ideal for various projects.

Specifications

Length 24 in
Height 24 in
Width 24 in
Surface Type Smooth
Surface Mount Nail Up
Installation Location Basement
Mold Resistant true
Drop-In Drop-In
Material Tin
Style Classic Industrial
Color White
Tile Size 24 in
Category Home Improvement

Similar Products

No similar products found right now.