Tall Vintage Black and Tan Hickory Curio Cabinet with Glass Doors
Colors:
Black
Light-brown
$628.00
$351.49
44% less
Prices updated 3 days ago
Bush Home
Lowest Price
$351.49
Wayfair
$370.00
Bed Bath & Beyond
$403.09
Description
Showcase your cherished items with this elegant curio cabinet. Featuring adjustable shelves and stylish windowpane glass doors, it combines modern and farmhouse elements. Ideal for any living space, it offers both beauty and functionality.
Specifications
Length
31.22 in
Height
72.01 in
Width
15.67 in
Weight
126 lb
Category
Kitchen & Tabletop
Related Products
Similar Products
No similar products found right now.
Related Searches
Rolling Dresser
Sauder Dresser
1920S Dresser
Upholstered Dresser
Tall Vintage Rattan Floor Lamp
Vintage Tall Orb Lamps with Fringe
Vintage Tall Metal Globe Ornate Brass Table Lamp
Vintage Tall Electrified Floor Lamp Black and Gold
Vintage Tall Vase Square Black and White Geometric Pattern
Vintage Bar Stands
Tall Antique Display Cabinet
Black Vintage Style Console Table
Vintage Tall Cat Figurines
Armoire Mirrored Vintage
Industrial Pipe Wood Shelf
Tall Iron Plant Stand
Rooms with Tall Black Industrial Bookcase
Vintage Tall Table Lamps
Vintage Tall Stoneware Vase
Tall Towel Rack
Green Lily Tall Lights Indoor Vintage
Vintage Trumpet Vases
Vintage Floral Scroll Holder
Vintage Balloon Back Chairs